FBOP Federal Correctional Institute

Owner
U.S. Department of Justice
Federal Bureau of Prisons (FBOP)

Contract
$25 million
Design-build

Services

  • Preconstruction
  • Central chilled water pant
  • Central heating water plant
  • Heating and chilled water site piping
  • HVAC interior distribution piping
  • Multi-zone and VAV air-handling systems with energy recovery
  • Plumbing
  • Sheet metal
  • Fuel systems
  • Temperature controls
  • LEED® Silver certification

GOVERNMENT

FBOP Federal Correctional Institute
Hazelton, W.V.

U.S. Engineering Company was the mechanical design-build team member on this 535,000-square-foot Federal Correctional Institute for the FBOP.

The design-build team used a collaborative approach to defining scopes of work and hard/competitive pricing at the proposal stage of the project before the start of design.

The project encompassed multiple buildings, including three, four-level general housing units, a special housing unit, maintenance, personal services, health services, food services, recreational, inside and outside administration, vocational training and a UNICOR factory.

Building systems include:

  • A central heating and cooling plant with buried site hydronic distribution piping
  • Multi-zone air-handling units with energy recovery wheels for energy efficient systems in inmate buildings
  • Combination multi-zone and VAV air-handling systems in other areas
  • Integrated building automation system that ties all buildings’ HVAC systems together for more effective facility-wide energy management